Thursday 15 July 2021

Year 6 Bridge Competition

The children had to create a bridge that was 50cm high and 1m long. The bridge was made using recycled materials and was put to the test with toy cars. Today, the bridges were put to the test. They had to have 2 complete passes with a car that weighed 2.8kg. The winners were, ‘Le Bridge’.  




No comments:

Post a Comment